High yield strength of steel for steel structure plants
Lightweight design -Self-weight is 50 per cent of that of a concrete structure.
Lower overall costs
The production of steel plants is a highly systematic process
1. Design Planning and Review
Define the use of the steel plants (e.g. storage, production plant), span requirements, load parameters (static load, dynamic load, wind load, etc.)
2. Construction drawing deepening of steel plants
refinement of component dimensions, node connection methods (e.g. bolted or welded), prejudgement of machining allowances and welding shrinkage
3.Raw material procuremen
t and pre-processing
Selection and Inspection
The main material is selected from carbon steel or low alloy steel such as Q235B, Q345B, etc. Verify the quality certification documents, and double-check the mechanical properties and chemical composition.
High-strength bolts need to be rust-proof, and welding materials (such as J507 welding rod) need to be moisture-proof management.
Surface treatment of steel plants
Steel is sandblasted to remove rust to Sa2.5 cleanliness, sprayed with temporary anti-rust paint (shop primer)
4.Component Machining and Forming of steel plants
Cutting and Uncutting
CNC technology: laser/plasma cutting accuracy up to ±1mm for key parts such as main beams and columns; manual cutting only for non-standard parts
Burrs need to be polished after cutting, bevelling with edge milling machine.
4.Assembly and Welding
Positioning
assembled on the tyre frame, such as box-type column first fixed base plate and web, control the amount of misalignment ≤ 1mm
Welding process of steel plants
Methods: submerged arc welding (high efficiency, used for long straight welds), CO₂ gas shielded welding (small deformation, used for complex nodes).
Quality control: 100% ultrasonic flaw detection for primary welds, 20% sampling inspection for secondary welds.
6. Surface corrosion protection and coating of the steel plants
Coating process
primer (e.g. epoxy zinc-rich paint) + topcoat (polyurethane) sprayed in layers, coating thickness ≥ 100μm, adhesion scratch method test
7.Quality inspection and pre-assembly of steel plants
Whole process inspection
Raw material re-inspection → weld flaw detection (UT/RT) → dimensional calibration (e.g. column verticality ≤ H/1000)
Complex nodes or large components are pre-assembled in the factory to verify fit accuracy and avoid rework on site.
8.Transport and factory preparation
Packaging Protection
Protect edges of components with corner protectors and seal bolt holes with tape to prevent wear and tear during transport.
Marking management
Marking of component number, direction of installation and batch, matching delivery list Packaging protection
Edge protection of components, sealing of bolt holes with adhesive tape to prevent wear and tear during transport.
Star Er is a technology-based construction enterprise committed to promoting scientific and technological innovation to lead future life. We have been specializing in steel construction for more than 10 years.
Our products cover all types of steel structure buildings, including various prefabricated metal building warehouse, steel structure workshops, steel structure garages, steel structure poultry houses, steel structure prefabricated houses, etc.